Building the Master Schedule
After you prepare to build the master schedule and enter all of the scheduling parameters and rules the system needs to follow, you are ready to build your school's master schedule.
To build the master schedule:
- Validate the information you entered when you prepared to build the schedule.
- Run the Schedule Feedback report.
- Calculate the system rank if you need to adjust when the system schedules a section during the build.
- Build the workspace.
- Manually check the built master schedule for structural problems.
- Load students into the master schedule.
- Run the Requests Not Scheduled report.
- Add study hall sections and load studies. (optional)
- Create duties. (optional)
- Rotate the master schedule. (optional)
- Commit the master schedule for next year.
You can also populate next year’s homerooms using your new master schedule.