Rotating the Master Schedule You Build
If you want to rotate the master schedule you build, do the following:
- Build the schedule.
- Define a rotation map.
- Assign rotation IDs to each section in the master.
Note: You can auto-assign track IDs. On the Workspace tab, on the Options menu, click Rotation, then Assign Track IDs. Select the sections you want to include, then define the schedule expression. |
- Run the rotate schedule option.
Note: To analyze your current schedule, it is often helpful to color it with colored pencils so you can see the physical rotation. |